AQUAZERO slabs may be installed using wooden or metal support framework. Metal profiles must be highly resistant to corrosion. Guides and pillars can be 0.6 to 1.0 mm thick; the distance between pillars may vary from 400 to 600 mm. The metal framework must be dimensioned (thickness and distance between beams) according to the static requirements of the construction site (such as height and loads) and to wind force.
Use regular or double-sided adhesive tape on all the points in which the metal profiles touch hard surfaces such as walls, floors, pillars. Fix the guides to the supporting elements using suitable fixtures and anchorage elements (plugs, anchors etc).