The material must be stored near the construction site, so that the AQUAZERO slabs are given enough time to adapt to the temperature and humidity of the environment.
During the plastering and levelling of the AQUAZERO slabs and for the next 24 hours, the ambient temperature must not get below 5° C and must not exceed 40° C.